Letterville Bull Board Letterville | Bull Board
 


 

Front Page
A Letterhead History
About Us
Become A Resident
Edit Your Database Info
Find A Letterhead

Letterville Merchants
Resident Downloads
Letterville BookShop
Future Live Meets
Past Meets
Step-By-Steps
Past Panel Swaps
Past SOTM
Letterhead Profiles
Business Cards
Become A Merchant

Click on the button
below to chat with other
Letterville users.

http://www.letterville.com/ubb/chaticon.gif

Steve & Barb Shortreed
144 Hill St., E.
Fergus, ON, Canada
N1M 1G9

Phone: 519-787-2892
Fax: 519-787-2673
Email: barb@letterville.com

Copyright ©1995-2008
The Letterhead Website

 

 

The Letterville BullBoard Post New Topic  New Poll  Post A Reply
my profile login | search | faq | calendar | im | forum home

  next oldest topic   next newest topic
» The Letterville BullBoard » Letterhead/Pinstriper Talk » MDO to Metal Building Question

 - UBBFriend: Email this page to someone!    
Author Topic: MDO to Metal Building Question
Leonard Sappington
Visitor
Member # 4562

Icon 1 posted      Profile for Leonard Sappington   Author's Homepage   Email Leonard Sappington   Send New Private Message       Edit/Delete Post   Reply With Quote 
Got someone wanting a 4x8 MDO sign attached to the side of a metal building...

No Frame or anything, well just be screwing it to the building, I guess.

Any recomendations on how to go about this?

I was thinking Self Tappers spaced evenly on the top of the ribs on the side of the building..

Any New Revalations on this method ?

Thanks in advance..

--------------------
Leonard Sappington
lenopam@verizon.net

Posts: 123 | From: Clinton, Indiana | Registered: Mar 2004  |  IP: Logged | Report this post to a Moderator
John Deaton
Visitor
Member # 925

Icon 1 posted      Profile for John Deaton   Author's Homepage   Email John Deaton   Send New Private Message       Edit/Delete Post   Reply With Quote 
Leonard, I just put up two this week. Both were sixteen ft. long by 4ft. high. Did it just as you said. Used self drilling screws on the ribs. I had to do it by myself, so I used a two by four put up on the building to act as a ledge while I put in the screws. Slid the sign up the ladder, onto the ledge, and started putting in the screws. [Smile]
Edited to add where the mdo seamed together, I screwed in 4" by 6" pieces of mdo on the back of one of the signs sticking out from the edge, so the other sign would fit right against it. That way if the middle seam didnt end up on a rib, it didnt matter.

[ October 15, 2004, 06:04 PM: Message edited by: John Deaton III ]

--------------------
Maker of fine signs and
other creative stuff.
Located at 109 N. Cumberland ave.
Harlan, Ky. 40831
606-837-0242

Posts: 4172 | From: Ages-Brookside, Ky. Up the Holler... | Registered: Jul 1999  |  IP: Logged | Report this post to a Moderator
Curt Stenz
Visitor
Member # 82

Icon 1 posted      Profile for Curt Stenz   Email Curt Stenz   Send New Private Message       Edit/Delete Post   Reply With Quote 
Leonard, remember if you are installing one sign by yourself, to place the first screw in the center of the top of the sign. This will allow the sign to hang by itself so you level it before the rest of the screws. cs

--------------------
Curt Stenz Graphics
700 Squirrel Lane
Marathon, WI 54448

Posts: 590 | From: Marathon, WI 54448 | Registered: Dec 1998  |  IP: Logged | Report this post to a Moderator
   

Quick Reply
Message:

HTML is not enabled.
UBB Code™ is enabled.

Instant Graemlins
   


Post New Topic  New Poll  Post A Reply Close Topic   Feature Topic   Move Topic   Delete Topic next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:


Contact Us | Letterville. A Community Of Letterheads & Pinheads!

Powered by Infopop Corporation
UBB.classic™ 6.7.2

Search For Sign Supplies
Category:
 

                  

Letterhead Suppliers Around the World