------------------
Pete Kouchis
Say it with SIGNS, Inc.
Orland Park, IL, USA
Phone: (708)460-3001
Fax: (708)460-3006
Excellence is doing a common thing in an uncommon way
Booker T. Washington
First take the cost of the vinyl and double it.
Next, make and install 5' x 10' section in order to calculate installation time per 10 ft. (If you dont care to waste that much vinyl, place half as much and double your time.) So if a 10' section takes 30min., and
10' divides into 600'@60 times, then you'll have the answer.
example based on above:
30 min. per 10' section times 60 sections equal 30 hours labor, then add the material at double the price, and finally add 10% to the overall figure for your profit margin, which in some cases can be a bartering tool, but not the wisest way to go.
The final question is, what is your hourly charge?
Good Luck Pete
------------------
Ron Percell
Percell Signs
707-769-0639
Petaluma, California
percell@percellsigns.com
Percell Signs Web Site
------------------
a.k.a. Brian Born
Harrisburg, Pa
717.652.9073
members.home.net/sign-it/
This isn't Burger King, you can't have it your way.
What I do know is, new glass is almost always contaminated with various chemicals including silicone and dirt and construction dust.
You will need to figure in your time for thoroughly cleaning the glass. Also allow for the screw up factor and include the cost of vinyl and labor for redoing panes which either you or other contractors screwed up before the office opens. Maybe add 5% to 10% "just in case".
------------------
EmpYŽ is also known as Mayo Pardo. Seen wandering through Australia, currently in Elgin IL. 847 931-4171
For $20 worth of Free Postage, click here
FREE POSTAGE